Siding Guide
Does Siding Replacement in Bloomfield, NJ's Historic District Need Approval?

Yes, if the house is inside Bloomfield, NJ's Historic District. The township asks for a Historic Preservation Commission application before any exterior project in the district, and siding replacement is exterior work. Outside the district, New Jersey's construction code treats siding replacement on a one- or two-family house as ordinary maintenance, with no permit.
We are Four Seasons Roofing and Construction, a roofing and siding contractor at 38 Speer Ave in Clifton. Our page on siding in Bloomfield covers the work itself and how we price it, and the Bloomfield service area page covers everything else we do in the township. This guide covers one thing: the historic district review that sits on top of a siding job on certain Bloomfield blocks.
How do you know if your Bloomfield house is in the Historic District?
Check your block number against the township's Historic District Property List. The list goes by tax block, not by street. It names every lot on blocks 242, 245, 246, 248, 250, 251, 252, 271, 272, 275, 276, 281, 282, 283 and 284, and block 246 carries the note "the Green." Block 517 is only partly in, with lots 1, 2, 4, 9, 11, 13, 14, 15, 17, 20 and 23 listed.
Your block and lot are on your property tax bill and your deed. If the number is close and you aren't sure, call the commission's secretary through the Community Development Department at (973) 680-4053. The township's Historic Preservation Commission page says to get in touch with the secretary if you have questions about whether a project needs commission approval.
What does the township ask for before exterior work in the district?
An Application for Certificate of Appropriateness, filed with the Historic Preservation Commission in care of the Community Development Department, 1 Municipal Plaza, Room 105. The commission page says anyone "embarking on any project within the district on the exterior of your building/home or any site work on the property" should submit the application. New siding changes the outside of the house, so it falls under that line.
The application form, revised August 2022, lists what goes with it:
- photos of the existing conditions where the work will be done
- a current survey of the property
- a site plan or renderings of the proposed work
- a detailed description of each element of the project, with the proposed materials, colors, manufacturer specs, brochures or samples
- the names of any architect, engineer or contractor involved
The form also points to Chapter 302 of the Township Code for the current regulations. We have not quoted Chapter 302 here, because the code host blocks our reader, so ask the secretary for the section that covers your job.
Does the state require a permit to replace siding?
No, not on a one- or two-family house. New Jersey's Uniform Construction Code, at N.J.A.C. 5:23-2.7, lists "the repair or replacement of existing siding on one- and two-family dwellings" as ordinary maintenance, and it says no permit, inspection or notice to the enforcing agency is required for ordinary maintenance.
There are two limits in the same section. Polypropylene siding is carved out and is not ordinary maintenance. On buildings other than one- and two-family houses, only like-for-like siding work up to 25 percent of the total exterior wall area counts. So the state rule takes most Bloomfield houses off the construction permit list, but it does not touch the township's historic district review. The construction office and the commission each handle their own approval.
How does the hearing work?
You present the application in person. The form says applicants must appear before the commission at a regular meeting, normally at 7:00 PM on the third Tuesday of each month, held either over Zoom or in person in the Emergency Squad Conference Room at the back of the Municipal Building. The township's 2026 schedule lists December 15 as the last regular meeting of the year.
The form warns that incomplete applications will not be placed on an agenda, and that the hearing may be postponed if the commission needs more information. It also says it is useful to have your architect, engineer or contractor at the meeting to answer questions. We did not find a published filing deadline before each meeting, so ask the secretary how far ahead the application has to be in.
Bloomfield siding in the district, step by step
This is how the township's own documents line up for a siding job. The township does not publish it as a checklist, and the commission has the final word on any address.
| Step | What it involves | Where it comes from |
|---|---|---|
| Check the block | Find your block and lot on the tax bill and compare it to the property list | Historic District Property List |
| Pick the material and color | Settle the siding product, profile and color, and get the spec sheet or a sample | Application, item 4 |
| Photograph the house | Photos of the existing siding where the work will happen | Application, item 1 |
| Gather the paperwork | Current survey, plus a site plan or renderings | Application, items 2 and 3 |
| File and appear | Send the application to Room 105, then present it at a third-Tuesday meeting | Application form and 2026 schedule |
| State permit check | None for one- or two-family siding replacement, unless it is polypropylene | N.J.A.C. 5:23-2.7 |
What should be settled before the siding is ordered?
The material and the color, because the application asks for both, with the manufacturer's specs or a sample. If the commission asks for changes, an order already placed can become a problem, so file the application before you buy the siding.
Settle in the written estimate who prepares the photos and the description, who goes to the hearing, and whether the start date waits for the commission's decision. If you want to compare materials before you file, our guide to signs it is time to replace your siding covers when siding has actually failed, and our post on roof replacement in Montclair's historic districts shows how a neighboring township handles the same kind of review.
One customer, Erica, wrote this on Google about siding we put on a new addition: "Ben and his team did a great job. They showed up on time, worked hard, cleaned up, and completed the projects quickly and as scheduled."
Questions about Bloomfield historic district siding
Do I need approval if my Bloomfield house is not in the Historic District?
Not from the Historic Preservation Commission, because its application applies to projects within the district. For the state construction permit, replacing existing siding on a one- or two-family house is ordinary maintenance under N.J.A.C. 5:23-2.7, so no permit or notice is needed. Polypropylene siding is the exception and does need to go through the construction office.
How do I find out if my Bloomfield property is in the Historic District?
Look up your block and lot on your tax bill, then check the township's Historic District Property List. It covers every lot on fifteen blocks around the Green, plus eleven listed lots on block 517. If you still aren't sure, the commission's secretary can be reached through Community Development at (973) 680-4053.
Does siding replacement require a permit in New Jersey?
Not on a one- or two-family house. The Uniform Construction Code lists repair or replacement of existing siding on those houses as ordinary maintenance, which needs no permit, inspection or notice. Polypropylene siding is excluded, and other building types are limited to like-for-like work up to 25 percent of the wall area. Local historic review is a separate step.
Talk to us about siding in Bloomfield
A historic district house in Bloomfield needs the commission's approval before new siding goes on, and a house outside the district needs no permit for it. Every siding job we do starts with an inspection and a written, itemized estimate. If your block is on the township's list, tell us when you call, and we will photograph the existing siding at the inspection and put the proposed material and color in writing so you have them for the application. Call (862) 318-3997, or use the form on this page.
Sources: Township of Bloomfield, Historic Preservation Commission, Historic District Property List, Application for Certificate of Appropriateness and 2026 Meeting Schedule. New Jersey Department of Community Affairs, N.J.A.C. 5:23-2, including 5:23-2.7 Ordinary maintenance. Read November 18, 2026. Rules change, so confirm current wording with the township.